One team for dismantling, haulage, metal recycling and certified destruction — so your site is handed back empty and documented.
Direct answer: A typical 3,000–10,000 sq ft factory clearance takes about 1–3 working days once the site is ready, including dismantling, loading and removal. Get a free on-site assessment first so the quote reflects the actual volume and access conditions.
| Category | Examples | Handling |
|---|---|---|
| Metals | Steel frames, plates, pipes, machine housings | Sorted, weighed and recycled |
| E-waste | Computers, servers, UPS, network gear | Recycled; drives destroyed separately |
| Stock | Unsold, expired or non-compliant goods | Certified destruction |
| Documents | Contracts, HR and finance files | Confidential shredding |
| General waste | Non-recyclable debris | Disposed per local regulations |
We work to ISO 45001 occupational safety standards: isolation of power, gas and water before dismantling, method statements for heavy lifts, and trained operators for grab and crane lorries.
WhatsApp with the site address, approximate floor area and a few photos. Assessments are free across Hong Kong.
Once the site is ready (power and services isolated, access clear) most clearances can be scheduled within days; large sites are phased over an agreed programme.
Yes — recoverable metals are weighed and priced, which typically offsets part of the clearance cost.
Yes — files are collected in locked containers and destroyed under CCTV with a certificate.
Yes, with agreed access hours and lift/loading arrangements so that operations are not disrupted.